This Middle East date paste project is designed to process dry dates into smooth date paste at approximately 1T/H. The proposed process includes raw material conveying, bubble washing, steam pretreatment, date pitting and pulping, colloid milling, high-shear homogenization and final packaging. The project is intended for 500g, 1kg and 5kg package sizes, with the final packaging machine to be selected according to the confirmed pouch format.

Table of Contents

Need a Customized Solution?

Tell us your product, bottle size and required capacity. Our engineers will recommend the right machine configuration for your production needs.

Dates are an important agricultural and food-processing raw material in the Middle East. For this project, the customer plans to process dry dates into date paste through a complete processing system.

The proposed production capacity is approximately 1 ton per hour. The process starts with dry date handling and washing, followed by pretreatment to soften the fruit, pitting and pulping, fine grinding and homogenization.

The final date paste is intended for packaging in 500g, 1kg and 5kg formats. The exact packaging machine will be selected after the customer confirms the final pouch structure and packaging style.

Project Overview

The project is designed around the following processing concept:

Dry Dates → Conveying → Bubble Washing → Sorting → Steam Pretreatment → Dewatering → Conveying → Pitting and Pulping → Storage → Colloid Milling → High-Shear Homogenization → Packaging

The main purpose of the pretreatment stage is to soften the dry dates before the pitting and pulping process.

Item Project Requirement
Project Region Middle East
Raw Material Dry dates
Processing Capacity Approx. 1T/H
Main Product Date paste
Pretreatment Steam softening required
Main Processing Pitting, pulping, grinding and homogenization
Packaging Sizes 500g, 1kg and 5kg
Packaging Type To be confirmed

Raw Material Handling and Bubble Washing

The production line begins with a stainless steel conveyor system designed for approximately 1T/H capacity.

The dates are then transferred to a bubble washing and lifting machine.

The washing system uses a bubble-generating device to keep the material in a rolling condition during cleaning, helping remove impurities from the surface of the dates. The equipment is made from SUS304 stainless steel and includes a lifting section for transferring the cleaned material to the next stage.

After washing, the dates move to a sorting platform with four working positions.

The sorting stage allows operators to remove unsuitable raw materials before further processing.

Bubble washing machine for fresh banana processing

Steam Pretreatment for Dry Dates

According to the customer’s requirement, the dry dates need to be softened before pitting and pulping.

The original equipment proposal includes a blanching machine, but the project requirement specifically refers to steam pretreatment. Therefore, the final pretreatment equipment should be selected according to the required softening process.

This is an important engineering point.

The purpose of the pretreatment stage is to make the dry dates easier to process before entering the pitting and pulping machine.

After pretreatment, the material passes through a dewatering and air-drying section before being transferred to the next process.

The equipment configuration should ensure that the dates are sufficiently softened for efficient pitting while avoiding unnecessary damage to the product structure.

Date Pitting and Pulping

After pretreatment, the dates are transferred to a double-channel pitting and pulping machine.

The machine is designed for stone-fruit processing and is suitable for products such as dates, mangoes, peaches and apricots.

For this Middle East project, the equipment performs two important functions:

  • Separating the pits from the date pulp
  • Processing the softened date flesh into a pumpable paste

The proposed capacity is approximately 1T/H, matching the target capacity of the upstream processing system.

The processed date pulp is then transferred to a 300L stainless steel storage tank through a screw pump.

Fine Grinding with a Colloid Mill

To improve the consistency of the product, the date pulp passes through a colloid mill.

The colloid mill is made from SUS304 stainless steel and is used for further refining the date paste.

This stage helps reduce the particle size and produce a smoother product before homogenization.

After grinding, the date paste is transferred to another storage tank through a screw pump.

The use of screw pumps is suitable for transferring concentrated materials through the processing line.

High-Shear Homogenization

The final processing stage includes a 1,000L high-shear emulsification and homogenization tank.

The tank is made from SUS304 stainless steel and uses a three-layer electrically heated structure.

The high-shear system provides intensive mixing and homogenization of the date paste.

This stage is important for improving the uniformity of the finished product before packaging.

The proposed processing sequence is therefore:

Date Pulp → Fine Grinding → High-Shear Homogenization → Finished Date Paste

Main Processing Equipment

The main equipment included in the proposed project is summarized below.

Processing Stage Main Equipment Capacity / Specification
Raw Material Feeding Conveyor 1T/H
Washing Bubble Washing and Lifting Machine 1T/H
Sorting Sorting Platform 4 working positions
Pretreatment Steam Softening Equipment To be finalized
Dewatering Dewatering and Air-Drying Machine Included
Pitting Double-Channel Pitting and Pulping Machine 1T/H
Storage Stainless Steel Tank 300L
Transfer Screw Pump Approx. 3T/H flow
Fine Grinding Colloid Mill Model 180
Homogenization High-Shear Emulsification Tank 1,000L

The main processing equipment is based on the supplied project proposal, including the 1T/H conveying, washing, sorting and pitting/pulping sections, followed by storage, colloid milling and high-shear processing.

Packaging Requirements for Date Paste

The customer plans to package the finished date paste in:

  • 500g
  • 1kg
  • 5kg

The project proposal currently identifies a stainless steel screw extruder before the packaging stage.

However, the final packaging machine has not yet been determined because the exact pouch structure still needs to be confirmed.

The source information indicates that the customer is considering a plastic three-side-seal pouch, but this packaging format remains to be finalized.

Therefore, the final packaging equipment should be selected after confirming:

  • Pouch material
  • Pouch dimensions
  • Three-side seal or other pouch structure
  • Product weight
  • Required packaging speed
  • Filling method

This confirmation is necessary to ensure that the packaging machine matches the viscosity and flow characteristics of the date paste.

Why Process Integration Matters

A date paste production line should not be designed as a collection of independent machines.

Each processing stage affects the next.

The washing system influences raw material cleanliness. Steam pretreatment affects the softness of the dry dates. The pitting and pulping system determines how efficiently the fruit flesh is separated from the pits. Fine grinding and high-shear homogenization influence the final texture and consistency of the date paste.

For this Middle East project, the proposed equipment follows a continuous process structure:

Cleaning → Softening → Pitting → Pulping → Grinding → Homogenization → Packaging

This configuration provides a clear production path from dry dates to finished date paste.

Key Technical Points Before Final Equipment Confirmation

Before the final production line is manufactured, several details should be confirmed.

1. Steam Pretreatment Method

The customer requires steam softening, while the preliminary equipment list includes a blanching machine.

The final pretreatment equipment should therefore be confirmed according to the required steam process.

2. Date Raw Material

The variety, moisture content and hardness of the dry dates should be considered when confirming the processing parameters.

3. Final Date Paste Consistency

The required texture will influence the operating conditions of the colloid mill and high-shear homogenization system.

4. Packaging Format

The customer requires 500g, 1kg and 5kg packaging, but the final pouch structure still needs confirmation.

The packaging machine should be selected only after the bag design and sealing method are finalized.

5. Final Production Speed

The upstream processing capacity is approximately 1T/H, while the final packaging speed should be matched to the selected package weights.

A Complete Date Paste Processing Solution for the Middle East

This project demonstrates a practical approach to date paste processing for customers in the Middle East.

The system is designed to process dry dates through washing, steam softening, pitting, pulping, fine grinding and high-shear homogenization.

The main processing equipment uses stainless steel construction, including SUS304 material for the major food-contact equipment.

The final production line can be configured around the customer’s raw material, finished-product consistency and packaging requirements.

By confirming the pretreatment process and final pouch design before manufacturing, the project can move from dry date preparation to finished packaged date paste through a coordinated production system.

FAQ

What is the processing capacity of this date paste production line?

The proposed upstream processing capacity is approximately 1 ton per hour, including conveying, washing and pitting/pulping equipment.

Can dry dates be processed directly?

The dry dates are first cleaned and then require pretreatment to soften the material before pitting and pulping.

What pretreatment method is used?

The customer requires steam pretreatment. The final equipment should be confirmed according to this requirement because the preliminary list currently includes a blanching machine.

Does the line include a date pitting machine?

Yes. The project includes a double-channel pitting and pulping machine designed for approximately 1T/H processing.

Why is a colloid mill used?

The colloid mill provides further fine grinding of the date pulp before the homogenization stage.

What packaging sizes are required?

The customer requires 500g, 1kg and 5kg packaging formats.

What type of packaging machine will be used?

The final packaging machine has not yet been confirmed. The customer’s preferred pouch format needs to be finalized before selecting the appropriate filling and sealing equipment.

Start Your Date Paste Processing Project

If you are planning a date paste production line in the Middle East, the equipment configuration should be based on your date raw material, processing capacity, required paste consistency and final packaging format.

Zhongyilong can help configure a complete processing solution covering date washing, pretreatment, pitting, pulping, fine grinding, homogenization and packaging.

Send us your raw material information, target production capacity and packaging requirements to receive a customized technical proposal for your date paste processing project.

Email: zhongyilong@zylpacking.com
WhatsApp: +86 19138171383

About Zhongyilong Machinery

Henan Zhongyilong Machinery Equipment Co., Ltd. specializes in beverage and packaging machinery, providing complete production solutions for bottled water, juice, beverages and other liquid products. Our engineering services cover equipment selection, production line integration, installation, commissioning and technical support.

Written by Zhongyilong Engineering Team

Tell Us About Your Project

Share your beverage type, target capacity, and project requirements. Our engineers will help you plan the right production line and provide a customized solution for your factory.

Get your initial solution within 24 hours.

ZHONGYILONG takes your privacy very seriously. All information will not be disclosed to third parties.

Get an Instant Quote

Avoid your inquiry is delay response, please enter your WhatsApp/Wechat along with the message, so we can contact you at the very first time.